THE FACTORS INFLUENCING STUDENTS TEACHERS PERFORMANCE IN TEACHING PRACTICE
THE FACTORS INFLUENCING STUDENTS TEACHERS PERFORMANCE IN TEACHING PRACTICE
August 15, 2017
ACTIVITIES OF Na+ K+-ATPase IN THE LIVER OF NORMAL AND PROTEIN UNDERNOURISHED RATS FED WITH DIET CONTAINING COCONUT OIL
ACTIVITIES OF Na+ K+-ATPase IN THE LIVER OF NORMAL AND PROTEIN UNDERNOURISHED RATS FED WITH DIET CONTAINING COCONUT OIL
August 20, 2017
Show all

THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)

 3,000

SKU: BCH36 Category:

Contact Us

    08165312322, 08119982823
    08165312322

RESEARCH INFORMATION

: THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)
: Chapter 1 – 5
: #3, 000
: Ms Word format

This study, THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE) contains concise information that will serve as a framework or guide for your project work. The project study is well-researched for academic purposes and are usually provided in complete chapters with adequate References.

Keywords: THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)

RESEARCH BODY

ABSTRACT

This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and disruption in the normal processes of procuring and prosecuting building and civil engineering construction work at both pre-contract and post contract stages of construction. The factors that usually call for these delay and disruption in construction projects of the numerous project on the construction landscape and on the parties that are involved in carrying out the projects.   This study continued with elucidating what the Quantity Surveyor and the other parties involved in the construction process can do to eliminate delays and disruption in construction in Nigeria.    According to this study, inadequate planning, incompetent project manager, variation in project scope, political factors, price fluctuation etc., contributes to the delays and disruption of building construction project and thereby affecting their cost also. Most of the proper majors are recommended for the elimination of delays and disruptions on construction project i.e Adequate pre-contract study, engaging competent construction professionals etc.

TABLE OF CONTENTS

CHAPTER ONE

INTRODUCTION

1.1    Background of study

1.2    Statement of problem

1.3    Purpose of study

1.4    Research Questions

1.5    Significance of study

1.6    Scope of Study

1.7    Definition of Terms

CHAPTER TWO

LITERATURE REVIEW

2.1    Delay and Disruption

2.2    Construction Delay and Causes

2.2.1 Why Construction Projects are delayed and Abandoned

2.2.2 Common problems causing delay in construction

2.2.3 Inadequate pre-contract study and Planning

2.2.4 Award of Contract

2.2.5 Variations

2.2.6 Fluctuations

2.2.7 Natural Disaster

2.2.8 Poor Executive Capacity of the Contractor

2.3    Cause of High Costs of Construction

2.4    Time Over-Runs and Cost

2.5    Delay and Disruption in Construction in Summary

CHAPTER THREE

METHODOLOGY

3.1    Research Design

3.2    Area of Study

3.3    Population of Study

3.4    Sampling Technique

3.5    Instrument for Data Collection

3.6    Validity of an Instrument

3.7    Reliability of Instrument

3.8    Method of Data Collection

3.9    Method of Data Analysis

CHAPTER FOUR

PRESENTATION AND ANALYSIS 0F DATA OR RESULT

4.1    Results

CHAPTER FIVE

DISCUSSION AND CONCLUSION OF RESULTS

5.1    Discussion of Findings

5.2    Conclusion of the Study

5.3    Recommendation

5.4    Implication of the Findings

5.5    Suggestion for Further Study

5.6    Limitation of Study

REFERENCES

APPENDIX

Keywords: THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)



NOTE: INSTANT DOWNLOAD SERVICE

Have you made payment for this project? If YES, Get a Download Code by contacting our Customer Care.

If NO, Place an Order Now.

For further enquiries, call our Hotlines: (+234) 0816-531-2322, 0811-998-2823


HIRE A WRITER | BROWSE OTHER PROJECTS | HOW TO PAY FOR PROJECT

Keywords: THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)

Got something to discuss?


 

HOW DO I MAKE PAYMENT FOR THIS PROJECT





Not the topic you are looking for ? Search here


DISCLAIMER: myproject.com.ng focus on attracting students and researchers to materials that can be used as guide, framework, and reference for their project work. All contents/materials on this website are for research purposes only and for no reason should you copy verbatim. This platform is not encouraging any form of plagiarism, neither are we advocating the use of the project materials for cheating. We strictly recommend that research project topics and materials ordered for should serve as a guide or framework only. The contents therein should be used to generate fresh ideas for your own research. Finally, myproject.com.ng will not be liable for any material used inappropriately.