RESEARCH INFORMATION

PROJECT TOPIC : THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA

CHAPTERS: Chapter 1 – 5
PRICE : #3, 000
PAGES: 54
FORMAT: Ms Word

This study, THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE) contains concise information that will serve as a framework or guide for your project work. The project study is well-researched for academic purposes and are usually provided in complete chapters with adequate References.

Keywords: THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)

RESEARCH BODY

ABSTRACT

This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and disruption in the normal processes of procuring and prosecuting building and civil engineering construction work at both pre-contract and post contract stages of construction. The factors that usually call for these delay and disruption in construction projects of the numerous project on the construction landscape and on the parties that are involved in carrying out the projects.   This study continued with elucidating what the Quantity Surveyor and the other parties involved in the construction process can do to eliminate delays and disruption in construction in Nigeria.    According to this study, inadequate planning, incompetent project manager, variation in project scope, political factors, price fluctuation etc., contributes to the delays and disruption of building construction project and thereby affecting their cost also. Most of the proper majors are recommended for the elimination of delays and disruptions on construction project i.e Adequate pre-contract study, engaging competent construction professionals etc.

TABLE OF CONTENTS

CHAPTER ONE

INTRODUCTION

1.1    Background of study

1.2    Statement of problem

1.3    Purpose of study

1.4    Research Questions

1.5    Significance of study

1.6    Scope of Study

1.7    Definition of Terms

CHAPTER TWO

LITERATURE REVIEW

2.1    Delay and Disruption

2.2    Construction Delay and Causes

2.2.1 Why Construction Projects are delayed and Abandoned

2.2.2 Common problems causing delay in construction

2.2.3 Inadequate pre-contract study and Planning

2.2.4 Award of Contract

2.2.5 Variations

2.2.6 Fluctuations

2.2.7 Natural Disaster

2.2.8 Poor Executive Capacity of the Contractor

2.3    Cause of High Costs of Construction

2.4    Time Over-Runs and Cost

2.5    Delay and Disruption in Construction in Summary

CHAPTER THREE

METHODOLOGY

3.1    Research Design

3.2    Area of Study

3.3    Population of Study

3.4    Sampling Technique

3.5    Instrument for Data Collection

3.6    Validity of an Instrument

3.7    Reliability of Instrument

3.8    Method of Data Collection

3.9    Method of Data Analysis

CHAPTER FOUR

PRESENTATION AND ANALYSIS 0F DATA OR RESULT

4.1    Results

CHAPTER FIVE

DISCUSSION AND CONCLUSION OF RESULTS

5.1    Discussion of Findings

5.2    Conclusion of the Study

5.3    Recommendation

5.4    Implication of the Findings

5.5    Suggestion for Further Study

5.6    Limitation of Study

REFERENCES

APPENDIX

Keywords: THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)

Keywords: THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE)